< POWER SYSTEMS LAB EQUIPMENTS >
 
TRANSMISSION LINE SYSTEM TRAINING SIMULATOR
(Professional Training Model for P.G Studies)
 
EHV AC Transmission Line Simulation Panel 220 KV/400 KV-180/360/540 Kms
VAR Compensation Simulation Panel - Shunt reactor, Shunt Capacitor, Series Reactor and SVC
RLC Loading Panel
Simulator Instrumentation - Electrical Power Analyzer
 
Experiments and Studies
Ferranti effect - Voltage and Current Profile of EHV AC Transmission Line under no - load condition.
ABCD parameter evaluation.
Surge Impedance and Surge Impedance loading studies.
Performance characteristics of transmission line - efficiency and regulation.
Conditions for maximum Power Transfer.
Line Compensation and Load compensation studies.
Voltage and reactive power control using tap changing Transformer.
Top

Copyright © HONALEC ENERGY SYSTEMS 2002, All Rights Reserved Powered by "Vdezyn Technologies Pvt. Ltd."